BYD Atto 3 2025

BYD Atto 3 2025

FROM
$39,990

The 2025 BYD Atto 3 range of configurations is currently priced from $39,990.

The 2025 BYD Atto 3 carries a braked towing capacity of up to 700 Kg, but check to ensure this applies to the configuration you're considering.

SUV
1 Speed Automatic
Electric

BYD Atto 3 2025 Towing Capacity

The 2025 BYD Atto 3 has maximum towing capacity of 750kg. Some models also offer heavy-duty or towing option packs which can increase towing capacity, as well as options which can hamper towing capacity. Towing capacities can vary wildly on a large number of factors. These include engine, transmission, model, and options chosen. Always check with the manufacturer or in your vehicles handbook before attempting to tow anything.
show more

BYD Atto 3 2025 FAQs

What Country is the BYD Atto 3 made?

The BYD Atto 3 is built in China, Thailand and India, with Australian examples being produced in China.

Show more

How to charge a BYD Atto 3 (how long, cost & how to open charing point)?

The BYD Atto 3 can be charged according to two different methods at home, the fastest being through a 7kW AC wall unit. These can cost anywhere from $800 to $2000, with additional charges depending on your energy provider and the state you live in. On average in Australia, at home costs range between 21 to 36 cents per kW, while there are no additional charges if your charger is hooked up to a renewable energy source such as solar. The overall charging time on the Standard Range variant is seven hours, while that time extends to nine hours on the Long Range variant. The other method is a standard AC wall socket, which charges at a standard rate of 240V. BYD says this will take 25 hours on the Standard Range or 30 hours on the Long Range. The quickest method overall is at a public charging point. A DC fast charger with 50kW capacity will see a 0-80 per cent charge on the Standard Range variant reached in 50 minutes, rising to 60 minutes on the Long Range variant. A DC fast charger with 100kW+ capacity will see that time drop to 40 and 42 minutes, respectively. Costs depend greatly depending on location, whether it is a peak period or not, and what the charger’s capacity is, though you should never pay more than $40 for a full charge.

Show more

See all BYD Atto 3 2025 FAQs
Disclaimer: You acknowledge and agree that all answers are provided as a general guide only and should not be relied upon as bespoke advice. CarsGuide is not liable for the accuracy of any information provided in the answers.

BYD Atto 3 2025 Wheel Size

Wheel size for the 2025 BYD Atto 3 will vary depending on model chosen, although keep in mind that many manufacturers offer alternate wheel sizes as options on many models. The wheel size available will alter the range of tyres available to be fitted.
show more

BYD Atto 3 2025 Fuel consumption

Fuel consumption for the 2025 BYD Atto 3 is dependent on the type of engine, transmission, or model chosen.